Residential Project Highland St.
Newton, MA

2021
Duration: 2 weeks
Scope of work: Front entrance - removing existing tiles with new tiles.
Quality preparation & Quality performance

 

__________________________________________________________________________

Commercial Project
Seaport Condominium
Quincy MA

2020
Duration: 2 week
s

 

__________________________________________________________________________

Commercial Project
Menton restaurant
Boston MA

2019
Duration: 1. week
Scope of Work: Remove drywall from the water damage. Install the new drywall, lighting fixtures. Provide and install the new wallpaper

 

__________________________________________________________________________

Residential Project
Preston Sq
Marina Bay, MA

2019
Duration: 8 weeks
Scope of Work: Kitchen & Bathroom renovation
Kitchen Design & Construction, Custom millwork & Tiling

 

__________________________________________________________________________

Residential Project
Preston Sq

Marina Bay, MA

2019
Duration: 8 weeks
Scope of Work: Kitchen & Bathroom renovation
Fireplace Design & installation, Bathroom Renovation

 

__________________________________________________________________________

Commercial Project
Prince of Newbury Street
Boston MA

2019
D
uration: 4 weeks
Scope of Work: Renovation of the entire common area lobby & residential floors. Removing existing tiles at front lobby. Provide & Install new tiles. Applying wallpaper in the hallways on all floors and lobby . Provide & Install new carpet tiles on all floors. Painting all interior walls in the hallway and common areas including the front lobby.
Wallpaper Installation & Painting New Carpet hallway

 

__________________________________________________________________________

Commercial Project
Skyline Condo Station Landing
Medford, MA

2018
Duration: 10 weeks
Scope of Work: Framing walls for newly added storage room. Installing steel screen decor,painting,Flooring(12 floors) and Lighting

 

__________________________________________________________________________

Commercial Project
Skyline Condominium

Medford, MA

2018
Duration: 6 weeks
Scope of Work: Removing the front lobby and each residential floor. Level the floor in the lobby, and provide & Install new carpet tiles and planks. Provide and Install the carpet tiles in the hallway. Painting all interior walls in the hallway and common areas including the front lobby. Level the floor and installation of the carpet tile

 

__________________________________________________________________________

Residential Commercial Project
Atelier Condo unit
Boston, MA

2017
Duration: 3 weeks
Scope of Work: Building a new frame for fire place. Installing frame of the fire place. Installing HDMI cables & TV Nero Slab frame &  Fire place under the TV

 

__________________________________________________________________________

Commercial Project
Board Walk Exterior
Quincy, MA

2017
Duration: 1 weeks (weather permitting)
Scope of Work: Prep & paint the entire board walk at Marina Bay.
In progress and After

__________________________________________________________________________

Commercial Project
Radio Station (WEZE)

Quincy, MA

2017
Duration: 2 weeks
Scope of Work: Removing existing rubber floor. Provide & install new carpet tiles. Painting all walls, trims, & doors. Area: 3,500 sqf, Before and after New carpet tiles & panting

 

 

__________________________________________________________________________

Commercial Project
Marina Bay Management Commercial Bathrooms

Quincy, MA

2017
Duration of work: 7 weeks
Scope of work: Renovation for 8 commercial bathrooms: Demolishing existing bathrooms, plumbing, electrical work, installing new tiles and new fixtures.
Before tiling the floor & panting the entire bathroom installing the fixtures


__________________________________________________________________________

Commercial Project
Marina Bay Management Lobby
Quincy, MA

2017
Duration of work: 3 weeks
Scope of work: Remove & dispose existing tiles. Provide & install new carpet tiles. Disconnect existing lighting. Provide & install new recess & pendant lighting. Painting all walls, trims & doors. Replace all ceiling tiles. Area: Approx. 3,000 sqf.
New carpet tiles & Painting at lobby new carpet tiles at hallway

 

__________________________________________________________________________

Commercial Project
Amity Insurance Company

Quincy, MA

2016
Duration of work: 5 weeks
Scope of work: Demolishing the existing offices and build new walls for new offices. Provide & Install new carpet tiles. Building new kitchens with cabinets for staffs. Provide & Install new planks flooring for the kitchen & concierge area. Painting all walls and trims. Provide & Install all ceiling tiles. Area: Approx. 4,000 sqf

 

__________________________________________________________________________

Commercial Project
South Shore Mental House
Quincy, MA

2016
Duration: 2 1/2 weeks
Scope of Work: Removing / Disposing existing carpet. Provide & Install new carpet tiles. Painting all walls & trims Area: Approx. 5,000 sqf
before and after removing the existing carpet new carpet tiles at hallway

 

__________________________________________________________________________

Commercial Project
Excelsior Condo
Quincy, MA

2014
Scope of Work:
Removing existing tiles at front lobby. Provide & Install new tiles. Applying wallpaper in the hallways on all floors and lobby . Provide & Install new carpet tiles on all floors. Painting all interior walls in the hallway and common areas including the front lobby.
New floor tiles at the entrance
New carpet tiles & painting at the hallway
New tiles & Wallpaper

 

__________________________________________________________________________

 

 

 
.
 