__________________________________________________________________________
Residential Project Highland St.
Newton, MA
2021
Duration: 2 weeks
Scope of work: Front entrance
- removing existing tiles with new
tiles.
Quality preparation & Quality
performance |

__________________________________________________________________________
Commercial Project
Seaport Condominium
Quincy MA

__________________________________________________________________________
Commercial Project
Menton restaurant
Boston MA
2019
Duration: 1. week
Scope of Work: Remove drywall
from the water damage. Install the
new drywall, lighting fixtures.
Provide and install the new
wallpaper |

__________________________________________________________________________
Residential Project
Preston Sq
Marina Bay,
MA
2019
Duration: 8 weeks
Scope of Work: Kitchen &
Bathroom renovation
Kitchen Design & Construction,
Custom millwork & Tiling |

__________________________________________________________________________
Residential Project
Preston Sq
Marina Bay, MA
2019
Duration: 8 weeks
Scope of Work: Kitchen &
Bathroom renovation
Fireplace Design & installation,
Bathroom Renovation |

__________________________________________________________________________
Commercial Project
Prince of Newbury Street
Boston MA
2019
Duration:
4 weeks
Scope of Work: Renovation of
the entire common area lobby &
residential floors. Removing
existing tiles at front lobby.
Provide & Install new tiles.
Applying wallpaper in the hallways
on all floors and lobby . Provide &
Install new carpet tiles on all
floors. Painting all interior walls
in the hallway and common areas
including the front lobby.
Wallpaper Installation & Painting
New Carpet hallway |

__________________________________________________________________________
Commercial Project
Skyline Condo Station Landing
Medford, MA
2018
Duration: 10 weeks
Scope of Work: Framing walls
for newly added storage room.
Installing steel screen
decor,painting,Flooring(12 floors)
and Lighting |

__________________________________________________________________________
Commercial Project
Skyline Condominium
Medford, MA
2018
Duration: 6 weeks
Scope of Work: Removing the
front lobby and each residential
floor. Level the floor in the lobby,
and provide & Install new carpet
tiles and planks. Provide and
Install the carpet tiles in the
hallway. Painting all interior walls
in the hallway and common areas
including the front lobby. Level the
floor and installation of the carpet
tile |

__________________________________________________________________________
Residential
Commercial Project
Atelier Condo unit
Boston, MA
2017
Duration: 3 weeks
Scope of Work: Building a new
frame for fire place. Installing
frame of the fire place. Installing
HDMI cables & TV Nero Slab frame &
Fire place under the TV |

__________________________________________________________________________
Commercial Project
Board Walk Exterior
Quincy, MA
2017
Duration: 1 weeks (weather
permitting)
Scope of Work: Prep & paint
the entire board walk at Marina Bay.
In progress and After |

__________________________________________________________________________
Commercial Project
Radio Station (WEZE)
Quincy, MA
2017
Duration: 2 weeks
Scope of Work: Removing
existing rubber floor. Provide &
install new carpet tiles. Painting
all walls, trims, & doors. Area:
3,500 sqf, Before and after New
carpet tiles & panting |
__________________________________________________________________________
Commercial Project
Marina Bay Management Commercial Bathrooms
Quincy, MA
2017
Duration of work: 7 weeks
Scope of work: Renovation for
8 commercial bathrooms: Demolishing
existing bathrooms, plumbing,
electrical work, installing new
tiles and new fixtures.
Before tiling the floor & panting
the entire bathroom installing the
fixtures |

__________________________________________________________________________
Commercial Project
Marina Bay Management Lobby
Quincy, MA
2017
Duration of work: 3 weeks
Scope of work: Remove &
dispose existing tiles. Provide &
install new carpet tiles. Disconnect
existing lighting. Provide & install
new recess & pendant lighting.
Painting all walls, trims & doors.
Replace all ceiling tiles. Area:
Approx. 3,000 sqf.
New carpet tiles & Painting at lobby
new carpet tiles at hallway |

__________________________________________________________________________
Commercial Project
Amity Insurance Company
Quincy, MA
2016
Duration of work: 5 weeks
Scope of work: Demolishing the
existing offices and build new walls
for new offices. Provide & Install
new carpet tiles. Building new
kitchens with cabinets for staffs.
Provide & Install new planks
flooring for the kitchen & concierge
area. Painting all walls and trims.
Provide & Install all ceiling tiles.
Area: Approx. 4,000 sqf |

__________________________________________________________________________
Commercial Project
South Shore Mental House
Quincy, MA
2016
Duration: 2 1/2 weeks
Scope of Work: Removing /
Disposing existing carpet. Provide &
Install new carpet tiles. Painting
all walls & trims Area: Approx.
5,000 sqf
before and after removing the
existing carpet new carpet tiles at
hallway |

__________________________________________________________________________
Commercial Project
Excelsior Condo
Quincy, MA
2014
Scope of Work: Removing
existing tiles at front lobby.
Provide & Install new tiles.
Applying wallpaper in the hallways
on all floors and lobby . Provide &
Install new carpet tiles on all
floors. Painting all interior walls
in the hallway and common areas
including the front lobby.
New floor tiles at the entrance
New carpet tiles & painting at the
hallway
New tiles & Wallpaper |

__________________________________________________________________________
|